PG Flow Solutions has secured a contract to ship pumps to another two wellboats that the Norwegian shipbuilder Aas Mekaniske Verksted is constructing for Sølvtrans.
A salmon fish farm in a Norwegian fjord. – Image © Stanislav – inventory.adobe.com.
PG Flow Solutions will provide eight giant seawater circulation pumps for each of the 2 wellboats. pressure gauge ดิจิตอล may even supply various engine room pumps which are required for the main engine and help engines, as properly as other general-purpose pumps as required for operating the wellboats.
The two wellboats are Aas Mekaniske Verksted newbuilds 213 and 214.
PG Flow Solutions just lately won contracts to provide pumps for newbuilds 208 – 212, that are all Sølvtrans wellboats.
“We are very happy to be a half of this value chain, which is now working like a finely tuned machine,” stated Øyvind Berg, vp of gross sales and marketing at PG Flow Solutions.
“The wellboats have been designed with fish welfare in thoughts. Our seawater circulation pumps have been developed with an similar philosophy. The merging of our applied sciences therefore makes sense operationally, financially and from an animal health perspective.”
The pump methods will be assembled at PG Flow Solutions’ main manufacturing facility at Sande in Vestfold, Norway, and delivered to Aas Mekaniske Verksted’s yard in Vestnes, Norway.
Share