IPR OVERHAULS PUMP FOR CUSTOMER IN MANUFACTURING SECTOR

เกจวัดแรงดัน PLATFORMS

IPR just lately supplied a pump dewatering solution to a repeat customer, after which undertook the complete rebuild of a broken pump set. Henru Strydom, operations supervisor at IPR, says that dealing with a pump rental firm that has the experience and functionality to undertake a whole pump overhaul was a serious advantage for this manufacturing sector customer.
MEDIA RELEASE – 16-08-2022

IPR OVERHAULS PUMP FOR CUSTOMER IN MANUFACTURING SECTOR

Dealing with a pump rental firm that has the expertise and capability to undertake a whole pump overhaul proved to be a serious advantage for a buyer within the manufacturing sector lately.
Having had previous pump rental expertise with IPR, this buyer requested urgent help when the pump it was using for water switch at its operation grew to become problematic.
pressure gauge 10 bar had been we capable of provide a rapid pump dewatering rental answer to this customer,” says Henru Strydom operations manager at IPR, “we have been additionally in a position to undertake the entire overhaul of the pump ensuring it was again in operation within a relatively short period of time.”

Years of operation transferring water from one dam to a different had taken it toll on the pump that was in use on the customer facility, and such is its manufacturing operation that it couldn’t be with no dewatering pump. IPR’s team have been contacted for a rental pump set and have been capable of deliver more than just that to its buyer.
Strydom says that the damaged pump was removed from web site and replaced with a rental unit. On additional inspection on the company’s comprehensively equipped facility, the IPR staff found that the injury was both mechanical and electrical, and that a full rebuild of the pump set could be essential to ensure dependable operation going ahead.
The pump set was utterly stripped, and individual components assessed previous to the ultimate determination on what work would must be done. The last overhaul saw all bearings replaced due to extreme put on and a new engine wiring harness replace the previous one which was damaged after short-circuiting. Other damaged components replaced together with the control panel.
Following this work, the pump set parts were spray painted in IPR’s in-house spray sales space, after which the pump was subjected to ultimate quality control inspections previous to it being examined within the company’s take a look at tank. “Doing this offers our buyer full assurance that the rebuilt pump set is capable of conferences its rated circulate of ninety litres per second at a maximum head of 25 metres,” Strydom says.
This just isn’t the primary full pump rebuild that IPR has carried out, and Strydom explains that having an in-depth understanding of pump applications and operations is a bonus especially when overhauling pump sets. “The stage of trust that lots of our prospects have in IPR has seen this sector of our enterprise broaden exponentially and we anticipate that it’s going to think about doing so.”

CAPTIONS

OVERHAUL PIC 01 : IPR lately undertook the whole rebuild of a broken pump set for a repeat buyer.
OVRHAUL PIC 02 : IPR maintains having an in-depth understanding of pump purposes and operations is a bonus particularly when overhauling pump units.
OVERHAUL PIC 03 : A full rebuild of the pump set ensured reliable operation going forward for this IPR customer.
OVERHAUL PIC 04 : The fully overhauled pump set which IPR undertook for a repeat customer within the manufacturing sector.
Hashtags

#roundtheclockdewatering

#hasslefreedewatering

#dewateringpumps

#dewatering

Contact info

On behalf of IPR

www.pumprental.co.za

LinkedIn : https://www.linkedin.com/company/integrated-pump-renta-/?viewAsMember=true

Facebook : https://www.facebook.com/IntegratedPumpRental/

Instagram : https://www.instagram.com/ipumprental/

From Coralynne & Associates

communicate@coralynne.co.za

Twitter : Coralynne_Assoc

LinkedIn : Coral-Lynn Fraser-Campbell

Share

Scroll to Top