IPR lately supplied a pump dewatering resolution to a repeat buyer, and then undertook the whole rebuild of a broken pump set. Henru Strydom, operations supervisor at IPR, says that coping with a pump rental firm that has the expertise and capability to undertake a complete pump overhaul was a major advantage for this manufacturing sector buyer.
MEDIA RELEASE – 16-08-2022
IPR OVERHAULS PUMP FOR CUSTOMER IN MANUFACTURING SECTOR
Dealing with a pump rental firm that has the experience and functionality to undertake an entire pump overhaul proved to be a serious advantage for a customer in the manufacturing sector lately.
Having had previous pump rental experience with IPR, this customer requested pressing help when the pump it was utilizing for water switch at its operation became problematic.
“Not solely were we in a place to present a fast pump dewatering rental resolution to this customer,” says Henru Strydom operations supervisor at IPR, “we have been additionally in a position to undertake the whole overhaul of the pump making certain it was again in operation inside a relatively quick period of time.”
Years of operation transferring water from one dam to a different had taken it toll on the pump that was in use on the customer facility, and such is its manufacturing operation that it could not be and not utilizing a dewatering pump. IPR’s staff had been contacted for a rental pump set and had been capable of deliver extra than just that to its buyer.
Strydom says that the damaged pump was faraway from site and replaced with a rental unit. On additional inspection on the company’s comprehensively equipped facility, the IPR group found that the harm was both mechanical and electrical, and that a complete rebuild of the pump set would be important to ensure dependable operation going ahead.
The pump set was fully stripped, and particular person parts assessed previous to the final determination on what work would must be carried out. The last overhaul noticed all bearings changed due to extreme put on and a new engine wiring harness exchange the old one which was damaged after short-circuiting. Other broken components replaced including the management panel.
Following this work, the pump set components had been spray painted in IPR’s in-house spray booth, after which the pump was subjected to last quality management inspections previous to it being tested within the company’s test tank. “Doing this provides our customer full assurance that the rebuilt pump set is able to conferences its rated flow of 90 litres per second at a most head of 25 metres,” Strydom says.
This is not the first full pump rebuild that IPR has carried out, and Strydom explains that having an in-depth understanding of pump applications and operations is an advantage especially when overhauling pump sets. “The level of belief that many of our clients have in IPR has seen this sector of our enterprise expand exponentially and we anticipate that it’ll think about doing so.”
CAPTIONS
OVERHAUL PIC 01 : IPR lately undertook the complete rebuild of a damaged pump set for a repeat customer.
OVRHAUL PIC 02 : IPR maintains having เกจวัดแรงดันออกซิเจนราคา -depth understanding of pump purposes and operations is an advantage especially when overhauling pump sets.
OVERHAUL PIC 03 : A full rebuild of the pump set ensured reliable operation going ahead for this IPR buyer.
OVERHAUL PIC 04 : The fully overhauled pump set which IPR undertook for a repeat buyer within the manufacturing sector.
Hashtags
#roundtheclockdewatering
#hasslefreedewatering
#dewateringpumps
#dewatering
Contact information
On behalf of IPR
www.pumprental.co.za
LinkedIn : https://www.linkedin.com/company/integrated-pump-renta-/?viewAsMember=true
Facebook : https://www.fb.com/IntegratedPumpRental/
Instagram : https://www.instagram.com/ipumprental/
From Coralynne & Associates
communicate@coralynne.co.za
Twitter : Coralynne_Assoc
LinkedIn : Coral-Lynn Fraser-Campbell
Share

Scroll to Top